-75.4618818029012 within an existing healthcare facility. The suite includes Fixed and Mobile Procedure Rooms, four Pre-Op/PACU bays, two Exam Rooms, a Physician Office, a Staff Lounge with Locker Area, Clean Linen and Storage spaces, and a Soiled Room.

The project required creative space planning and detailed coordination to accommodate ceiling-mounted interventional radiology equipment within the constraints of the existing building infrastructure. Special attention was given to integrating structural and mechanical systems above the ceiling to support critical equipment while maintaining functionality and workflow efficiency.

Medical equipment planning was a central focus throughout the design process, ensuring compatibility with current clinical needs and future flexibility. Tevebaugh Architecture led the project through the Pennsylvania Department of Health’s Division of Safety and Construction Inspection (DSCI) and Design and Construction Approval Committee (DAAC) processes, guiding the project from early planning through final regulatory approval.

CLIENT

MidLantic Urology

LOCATION

Chesterbrook, PA

BUILDING AREA

4,100 SF

DESIGN SERVICES

Planning & Programming Coordination
Construction Documents
Construction Administration
Medical Equipment Planning